Development of Contingency Value Analysis Model Using Cost-Time Risk Integration and WBS-Pareto Hybrid in Construction Projects.

NM Jaya, DK Sudarsana - International Journal on …, 2023 - search.ebscohost.com
The construction project stage generally consists of Preparation, Design, Preconstruction,
Implementation, and Use. The main performance aspects at the implementation stage are …

Analysis Value Engineering at Work Apartment Building Wall

A Salsabila, D Setyowulan, E Arifi - ASTONJADRO, 2024 - ejournal.uika-bogor.ac.id
It was Optimizing resources to analyze cost efficiency in implementing construction projects.
One method that can be used for resource optimization is value engineering (VE). Value …

[PDF][PDF] Analysis of Function Improvements Due To Changes In Core Zone Material Based on Value Engineering at Urugan Batu Dam

D Kusumastuti, A Suroso - Journal Research of Social Science …, 2023 - academia.edu
Revised: 13th January 2023 Accepted: 25th January 2023 Abstract: An embankment dam is
a large artificial embankment made by placing and compacting various compositions of soil …

Application of Function Analysis using Function Analysis System Technique (FAST) Diagram on Taman Sari Apartment Construction Project

IGA Diputera - Journal of Applied Science, Engineering …, 2022 - jpabdimas.idjournal.eu
Construction projects require costs as a very important element in their implementation.
There are several alternative methods that can be used as a rationale for conducting studies …

Value Engineering Construction of the Unisa Campus Saintek Building 2

RS Ady, F Kurniawan… - WORLD JOURNAL OF …, 2021 - world.journal.or.id
Abstract This Value Engineering analysis is carried out to analyze or organize a construction
of the SAINTEK UINSA 2 building which aims to produce appropriate quality that does not …