EI Daniel, C Pasquire, G Dickens… - Engineering, construction …, 2017 - emerald.com
Purpose The purpose of this paper is to identify how the newly emerging UK practice of “collaborative planning”(CP) for construction project delivery aligns with the advocated …
CI Lagos, RF Herrera, LF Alarcón - Journal of Construction …, 2019 - ascelibrary.org
This paper seeks to identify improvements in the level of implementation of the Last Planner System (LPS) with the use of information technologies (IT) based on its methodology. In …
The Egan report, generally called Rethinking Construction, challenged the lack of collaboration in planning, designing, and executing work on site, and recommended the …
Performance measurement (PM) generates useful data for process control, facilitates communication between different sectors, and helps to align efforts on the most important …
CI Lagos, RF Herrera, LF Alarcón - Proc. Lean & Computing in …, 2017 - academia.edu
The Last Planner System (LPS) has been in use for over 20 years; however, some of its components remain at a basic level of implementation. This paper seeks to identify …
Abstract El sistema Last Planner (LPS) ha sido implementado por más de 20 años y ha demostrado un impacto positivo en la estabilización de los flujos de trabajo, reducción de …
RC Bortolazza, DB Costa… - 13th International Group …, 2005 - search.informit.org
In Brazil, the Last Planner system has been implemented since 1996 in a large number of construction sites. However, most research studies developed so far have emphasised the …
AC Soares, MMS Bernardes… - Annual Conference of the …, 2002 - researchgate.net
Several papers have discussed the importance of the Last Planner Method as a means of stabilizing the production process in building sites. After process stabilization, however, a …
MP Sterzi, EL Isatto, CT Formoso - Proc., 15th Annual Conf. of the …, 2007 - researchgate.net
Much of the waste in the construction industry is related to ineffective planning, including design delays, flaws in the planning system and ineffective integration of suppliers in the …