Progress of Establishing the China-Indonesia Joint Laboratory on HTGR

J Sun, Z Li, C Li, Z Sui, H Yan, W Qi, X Ren… - … Engineering and Design, 2022 - Elsevier
Based on good collaborative intents, the China-Indonesia Joint Laboratory on High
Temperature Gas-cooled Reactor (HTGR) was co-established in 2017 by the Ministry of …

Scaling law method for cost estimation of Indonesia's first HTGR (PeLUIt-40) and its implementation strategy

RFS Budi, S Ariyanto, DH Salimy, D Nurmayady… - … Engineering and Design, 2024 - Elsevier
The Indonesian government has planned to build its first high-temperature gas reactor
(HTGR), PeLUIt-40. A lack of estimates for PeLUIt-40′ s costs hamper planning and …

COMPACT HTGR SIMULATOR DEVELOPMENT IN THE CHINA-INDONESIA JOINT LABORATORY

J Sun, Z Sui, C Wei, M Subekti - The Proceedings of the International …, 2023 - jstage.jst.go.jp
ABSTRACT The China-Indonesia Joint Laboratory (hereinafter, Joint Lab) on High
Temperature Gas-cooled Reactor (HTGR) focuses on the capacity building in the field of …