Extensions of the resource-constrained project scheduling problem

H Ding, C Zhuang, J Liu - Automation in Construction, 2023 - Elsevier
The resource-constrained project scheduling problem (RCPSP) aims to schedule a set of
activities subject to resource and precedence constraints to minimize the project makespan …

Solving large-scale discrete time–cost trade-off problem using hybrid multi-verse optimizer model

PVH Son, NT Nguyen Dang - Scientific Reports, 2023 - nature.com
The analysis of the relationship between time and cost is a crucial aspect of construction
project management. Various optimization techniques have been developed to solve time …

A novel multi criteria decision making model for optimizing time–cost–quality trade-off problems in construction projects

S Monghasemi, MR Nikoo, MAK Fasaee… - Expert systems with …, 2015 - Elsevier
The planning phase of every construction project is entangled with multiple and occasionally
conflicting criteria which need to be optimized simultaneously. Multi-criterion decision …

BIM-based resource tradeoff in project scheduling using fire hawk optimizer (FHO)

MB Shishehgarkhaneh, M Azizi, M Basiri, RC Moehler - Buildings, 2022 - mdpi.com
Project managers should balance a variety of resource elements in building projects while
taking into account many major concerns, including time, cost, quality, risk, and the …

A new multi-objective multi-mode model for solving preemptive time–cost–quality trade-off project scheduling problems

M Tavana, AR Abtahi, K Khalili-Damghani - Expert systems with …, 2014 - Elsevier
Considering the trade-offs between conflicting objectives in project scheduling problems
(PSPs) is a difficult task. We propose a new multi-objective multi-mode model for solving …

Multi-objective time–cost trade-off optimization for the construction scheduling with Rao algorithms

M Yılmaz, T Dede - Structures, 2023 - Elsevier
Determining the time and cost of activities is one of the most important stages of construction
project planning. Measures taken to shorten the time, such as the need for more or more …

Survey of quantitative methods in construction

D Briskorn, M Dienstknecht - Computers & Operations Research, 2018 - Elsevier
Quantitative methods and techniques from operations research (OR) are well-accepted in
many industries, eg the manufacturing industry or the transportation industry. Similarly …

Discrete particle swarm optimization method for the large-scale discrete time–cost trade-off problem

S Aminbakhsh, R Sonmez - Expert Systems with Applications, 2016 - Elsevier
Despite many research studies have concentrated on designing heuristic and meta-heuristic
methods for the discrete time–cost trade-off problem (DTCTP), very little success has been …

Optimizing time and cost simultaneously in projects with multi-verse optimizer

PVH Son, NT Nguyen Dang - Asian Journal of Civil Engineering, 2023 - Springer
Balancing time and cost has long been a primary focus of construction project management.
In this context, achieving optimal balancing time and cost objectives is crucial. The multi …

A fuzzy clustering-based genetic algorithm approach for time–cost–quality trade-off problems: A case study of highway construction project

S Mungle, L Benyoucef, YJ Son, MK Tiwari - Engineering Applications of …, 2013 - Elsevier
Recently government agencies have started to utilize innovative contracting methods that
provide incentives for improving construction quality. These emerging contracting methods …