An evolutionary approach to formulate the compressive strength of roller compacted concrete pavement

A Ashrafian, AH Gandomi, M Rezaie-Balf, M Emadi - Measurement, 2020 - Elsevier
The construction and maintenance of roads pavement was a critical problem in the last
years. Therefore, the use of roller-compacted concrete pavement (RCCP) in road problems …

A robust scheduling for the multi-mode project scheduling problem with a given deadline under uncertainty of activity duration

H Moradi, S Shadrokh - International Journal of Production …, 2019 - Taylor & Francis
The problem of this paper deals with the multi-mode project scheduling problem under
uncertainty of activity duration where only the renewable resources are taken into account …

Multi-project time-cost optimization in critical chain with resource constraints

MJ Taheri Amiri, FR Haghighi, E Eshtehardian… - KSCE Journal of Civil …, 2018 - Springer
The simultaneous reduction of the project cost and time has paramount importance in
today's competitive world; however, it is necessary to balance the project time and cost …

Optimization of time, cost and quality in critical chain method in multi project scheduling and resource constraints with considering utility function

MJ Taheri Amiri, F Haghighi, E Eshtehardian… - Journal of Structural and …, 2020 - jsce.ir
Considering that the mission of the project organization management is to create a
commitment to the timetable, which prevents project delays and increases associated costs …

A Multi Objective Time-Cost-Quality Optimization Model fot Project Scheduling and Human Resource Assignment Considering Manpower Competency

B Shojaee, H Dashti Naserabadi… - Journal of Structural and …, 2022 - jsce.ir
Today, information and knowledge are so intertwined with human life that the present age
has been called the information era. In this situation, the role of human in the organization …

Presentation of exact and metaheurestic solution method for minimization project completion time with considering budget constraint problem

M Hemmatian, MJ Taheri Amiri, O Ghenaat - Journal of Structural and …, 2019 - jsce.ir
Project planning and scheduling are one of the most important issues in construction
engineering and management. It is being crucial to progress developed countries. One of …

Time-Cost-Quality Optimization using an Invasive Weed Algorithm with Activity Preemption in Construction Projects

MJ Taheri Amiri, M Hematian, M Jooj - Amirkabir Journal of Civil …, 2021 - ceej.aut.ac.ir
In the last decade, various methods are created to optimize time, cost, and quality. Solving
such a problem on large scale is too hard using traditional methods in logical time. Recently …

بهینه‌سازی زمان، هزینه و کیفیت در روش زنجیره بحرانی در شرایط چند پروژه-ای و محدودیت منابع با در نظرگیری تابع مطلوبیت

طاهری امیری, حقیقی, فرشیدرضا, اشتهاردیان, احسان اله… - مهندسی سازه و ساخت, 2020‎ - jsce.ir
با توجه به این که رسالت مدیریت سازمان پروژه، ایجاد تعهد در قبال برنامه زمان‌بندی است، که مانع از
به تأخیر افتادن پروژه و افزایش هزینه‌های مرتبط می‌گردد و قبول این واقعیت که تأخیر در اتمام به …

Implementing the critical chain method for managing linear-repetitive projects such as road construction, taking into account the conditions of uncertainty and risk

AMJ Taheri, F Haghighi, E Eshtehardian, M Hematian… - 2020 - sid.ir
Nowadays traditional point of view is not able to meet the needs of construction project
management. Therefore, the use of modern management approaches can be greatly …