Drilling digital twin success stories the last 10 years

MG Mayani, M Svendsen, SI Oedegaard - SPE Norway Subsurface …, 2018 - onepetro.org
Objective of the paper is to describe and present results of using a" Digital Twin" in Drilling
Operations (Planning and Engineering, Training and Operational Support) in the last 10 …

Drilling seeking automatic control solutions

JM Godhavn, A Pavlov, GO Kaasa… - IFAC Proceedings Volumes, 2011 - Elsevier
This paper addresses control challenges within drilling for the oil and gas industry. Drilling
has not been modernized as much as other industries and there is still a great potential for …

Advanced dynamic training simulator for drilling as well as related experience from training of drilling teams with focus on realistic downhole feedback

SI Ødegård, BT Risvik, KS Bjørkevoll… - SPE/IADC Drilling …, 2013 - onepetro.org
The paper presents a highly advanced training simulator that combines an advanced top-
side simulator with a dynamic downhole simulator with an advanced transient integrated …

Mathematical Modelling of the Drilling Process for Real-time Applications in Drilling Simulation, Interpretation and Assistance

E Cayeux - 2019 - uis.brage.unit.no
For the last thirty years, mathematical modelling has been used to develop software
solutions that support drilling engineering activities at the planning stage of drilling …

Digitized uncertainty handling of pore pressure and mud-weight window ahead of bit: North Sea Example

AE Lothe, P Cerasi, M Aghito - SPE Journal, 2020 - onepetro.org
A digitized workflow from predrill pore‐pressure modeling with a Monte Carlo approach until
update of the pressure prognosis while drilling from (for example) sonic or resistivity data is …

The Operational Benefit of Testing HPHT/MPD Procedures Using an Advanced Full Scale Drilling Simulator

H Blikra, G Pia, JS Wessel, M Svendsen… - SPE/IADC Drilling …, 2014 - onepetro.org
A challenging HPHT well was drilled with Managed Pressure Drilling. In the preparation
phase, an advanced dynamic drilling simulator was used by the operator in order to test and …

A challenging HPHT operation supported by dynamic real time simulation, forecasting and 3D visualization

J Nabavi, R Rommetveit, JS Wessel… - SPE/IADC Drilling …, 2016 - onepetro.org
Abstract Dynamic Real Time Simulation, Forecasting and 3D Visualization was utilized
extensively in support of a very challenging HPHT drilling operation in the Norwegian Sea …

Use of a life cycle drilling simulation system on a challenging HPHT drilling operation in the Norwegian Sea

L Scott, JS Wessel, J Nabavi… - SPE/IADC Middle East …, 2016 - onepetro.org
Abstract A Life Cycle Drilling Simulation System (LCDSS) was utilized during planning,
training, and operation in support of a very challenging drilling operation in the Norwegian …

钻井风险控制系统关键技术

马鹏鹏, 周英操, 蒋宏伟, 赵亦朋 - 石油钻探技术, 1900 - syzt.com.cn
为了减少钻井中的井下故障, 并提高钻井效率, 控制钻井成本, 研究了钻井风险控制系统的关键
技术. 分析了NDS 系统及时传递信息的技术思路和随钻测量, 地质力学模型, 钻井风险管理 …

Statistical modeling for real-time pore pressure prediction from predrill analysis and well logs

J Paglia, J Eidsvik, A Grøver, A Elisabet Lothe - Geophysics, 2019 - library.seg.org
The challenge of pore pressure prediction in an overpressured area near a well is studied.
Predrill understanding of pore pressure is available from a 3D geologic model for pressure …