Earth Resistance and Earth Construction To Interference Currents On Swamp Land

DE Putra, Z Nawawi, MI Jambak - International Conference on …, 2022 - jurnal.uinsu.ac.id
To protect electrical power installation equipment, especially that in open areas where it is
particularly vulnerable to both technical and non-technical disturbances, such as those …

Overvoltages during Single-Phase Earth Fault in Neutral-Isolated Networks (10÷ 35) kV

SV Rzayeva, NS Mammadov… - Journal of Energy …, 2023 - journal.article2publish.com
Aims: The purpose of the article is to analyze networks with zero insulation (10÷ 35) kV,
which have disadvantages that adversely affect the insulation of operating equipment, as a …

Analysis of the Impact of Newly Built Grounding Grid on the Original Grounding Grid Based on the Method of Moments

L Wang, Z Liu, M Song, X Zheng, C Ma - Procedia Computer Science, 2023 - Elsevier
On the basis of the method of moments, the resistive coupling effect between the newly built
grounding network. When the horizontal distance between two grounding networks of a …

Mitigating Faults Effects on Equipment and Personnel on Substations

O Oputa, CS Ezeonye, PI Obi… - NIPES-Journal of …, 2023 - journals.nipes.org
Faults occur in substations and the effects of these faults range from damage of electrical
equipment connected to the substation to electrocution of personnel operating the …

[PDF][PDF] The Decreasing Ground Potential Rise by Lessening Soil Resistance in Arrester Grounding System

DE Putra, RA Yani, MS Siahan, C Rizal… - … Journal of Electrical …, 2023 - jurnal.narotama.ac.id
One of the requirements for a safe soil construction installation is a low soil resistance value
in accordance with standards, including those applicable in Indonesia, namely PUIL 2000 …

DESIGNING GROUND GRID FOR A 11KV SUBSTATION USING ETAP

GS Rani - NeuroQuantology, 2021 - search.proquest.com
Abstract ETAP (Electrical Transient Analyzer Program) is a powerful software tool utilized by
power systems engineers for electrical network modeling and simulation. Its primary …

[引用][C] Simulation of electromagnetic processes in the grounding system with a short circuit in the operating high-voltage substation

DG Koliushko, SS Rudenko, OY Istomin, AN Saliba - Electrical Engineering & …, 2022