A Babaei, G Locatelli, T Sainati - Project Leadership and Society, 2021 - Elsevier
Abstract The Front-End process plays an essential role in deriving infrastructure megaprojects' performance. However, Front-End issues often negatively impact the process …
B Sanchez, C Haas - Construction management and economics, 2018 - Taylor & Francis
Achieving true sustainability in the conceptualization of new building projects requires radical change compared to traditional green-field projects; circular building principles in a …
Scope management allows project managers to react when a project underperforms regarding schedule, budget, and/or quality at the execution stage. Scope management can …
MW Ibrahim, A Hanna, D Kievet - Journal of management in …, 2020 - ascelibrary.org
A project delivery system (PDS) defines the relationship and timing of involvement between different contracting parties in construction. Using data from 109 projects, this paper …
Adaptive reuse is a way of maximizing the residual utility of existing assets. Adaptive reuse makes it possible to retrieve components from an obsolete building through deconstruction …
The impacts of highway construction delays are not limited to the construction industry, but also affect the nation's overall economic and social conditions. One factor that can cause …
This paper proposes a framework for rapid seismic risk assessment of bridges using aerial photogrammetric surveys conducted by Unmanned Aerial Vehicles (UAVs). First, the data …
Front-end planning is arguably the most impactful activity in the management of construction projects. Small projects oftentimes have minimal planning completed prior to the start of the …
Infrastructure projects (IPs) face numerous challenges to reach the predefined aims over their life-cycle. There are many difficulties in projects because of the variety of elements in …