[PDF][PDF] PERHITUNGAN DAN PENGURANGAN LIMBAH ABU BATUBARA PRODUK PLTU BATUBARA DALAM RENCANA PEMBANGKIT 35.000 MW

RFS Budi, MM Farid - … Seminar Nasional Teknologi Pengelolaan Limbah XIII … - inis.iaea.org
DALAM RENCANA PEMBANGKIT 35.000 MW. Keputusan Menteri ESDM No. 0074.
K/21/MEM/2015 memberi mandat kepada PLN untuk membangun pembangkit listrik 35.000 …

Study of external cost for experimental power reactor nuclear facility due to radionuclide effluent discharge in Cisadane river

S Sufiana, BWS Abimanyu - 2018 - inis.iaea.org
[en] An economic study for calculating the cost of losses from possible health impacts
resulting from releases derived from the experimental power reactor (RDE) has been exist …

Nuclear liability for nuclear power plant in Indonesia

SA Elok, M June - 2016 - inis.iaea.org
[en] Nuclear power plant operators are responsible for any damages caused by the
operation of nuclear power plants and therefore they usually take out liability insurance to …

Calculation and reduction of ash coal waste produced by 35,000 MW coal power plant plan

FSB Rizki, MF Muhammad - 2015 - inis.iaea.org
[en] Decree of the Minister of Energy and Mineral Resources No. 0074. K/21/MEM/2015
gave a mandate to PLN to build 35,000 MW power plant from 2015 to 2024 with a share of …

[引用][C] Pertanggungjawaban Kerugian Nuklir Untuk Pembangkit Listrik Tenaga Nuklir Indonesia

ESA Nurlaila, J Mellawati - Prosiding Seminar Nasional Teknologi Energi Nuklir …, 2016