Energy-transport scheduling for green vehicles in seaport areas: A review on operation models

Y Lu, S Fang, T Niu, R Liao - Renewable and Sustainable Energy Reviews, 2023 - Elsevier
Internal combustion engine vehicles, although conventionally playing essential roles in
seaport logistic operation, are major sources of carbon emissions. To guarantee the “green …

Integer programming formulations in sequencing with total earliness and tardiness penalties, arbitrary due dates, and no idle time: A concise review and extension

B Alidaee, H Li, H Wang, K Womer - Omega, 2021 - Elsevier
Scheduling with arbitrary due dates and no idle time permitted between jobs with the
objective of minimizing the total earliness and tardiness has a variety of industry …

Mathematical optimization for earliness/tardiness minimization in a multiple automated guided vehicle manufacturing system via integrated heuristic algorithms

H Fazlollahtabar, M Saidi-Mehrabad… - Robotics and …, 2015 - Elsevier
In this paper, a scheduling problem for multiple automated guided vehicles (AGVs) in a
manufacturing system is proposed and formulated. Considering the due date of AGVs …

Reducing myopic behavior in FMS control: A semi-heterarchical simulation–optimization approach

GZ Rey, T Bonte, V Prabhu, D Trentesaux - Simulation Modelling Practice …, 2014 - Elsevier
Heterarchical FMS control architectures localize decisional capabilities in each entity,
resulting in highly reactive, low complexity control architectures. Unfortunately, these …

An exact approach for the blocks relocation problem

C Expósito-Izquierdo, B Melián-Batista… - Expert Systems with …, 2015 - Elsevier
Abstract The Blocks Relocation Problem seeks to find the shortest sequence of movements
to retrieve a set of homogeneous blocks placed in a two-dimensional storage according to a …

Distributionally robust single machine scheduling with the total tardiness criterion

S Niu, S Song, JY Ding, Y Zhang, R Chiong - Computers & Operations …, 2019 - Elsevier
This paper proposes a distributionally robust optimization (DRO) model for single machine
scheduling with uncertain processing times. The processing time of each job is assumed to …

Order acceptance and scheduling with earliness and tardiness penalties

S Thevenin, N Zufferey, M Widmer - Journal of Heuristics, 2016 - Springer
This paper addresses a production scheduling problem in a single-machine environment,
where a job can be either early, on time, late, or rejected. In order acceptance and …

Single machine scheduling problem with interval processing times to minimize mean weighted completion time

A Allahverdi, H Aydilek, A Aydilek - Computers & Operations Research, 2014 - Elsevier
The single resource scheduling problem is commonly applicable in practice not only when
there is a single resource but also in some multiple-resource production systems where only …

Solving the flexible job-shop just-in-time scheduling problem with quadratic earliness and tardiness costs

G Zambrano Rey, A Bekrar, D Trentesaux… - The International Journal …, 2015 - Springer
The flexible job-shop scheduling problem is known to be an (Non-deterministic Polynomial-
time hard) combinatorial problem and has become a challenge in optimization and …

Metaheuristics for the single machine weighted quadratic tardiness scheduling problem

TC Gonçalves, JMS Valente, JE Schaller - Computers & Operations …, 2016 - Elsevier
This paper considers the single machine scheduling problem with weighted quadratic
tardiness costs. Three metaheuristics are presented, namely iterated local search, variable …