[HTML][HTML] A high-level dynamic analysis approach for studying global process plant availability and production time in the early stages of mining projects

DT Cremonese, B Karanth, G Tomi - REM-International Engineering …, 2017 - SciELO Brasil
In the early stage of front-end studies of a Mining Project, the global availability (ie number of
hours a plant is available for production) and production (number of hours a plant is actually …

Mineral project design using ABC methodology and dynamic simulation.

DT Cremonese - 2019 - teses.usp.br
This work presents two innovative ways to evaluate mining projects. The first is the Activity-
Based Costing Approach in mining operations with a product mix. After analyzing and …

[PDF][PDF] A HIGH LEVEL DYNAMIC ANALYSIS TOOL TO STUDY THE IMPACT OF SURGE CAPACITY/STOCKPILE SIZING EARLY STAGE OF THE IRON ORE …

DT Cremonese, B Karanth - scholar.archive.org
In the early stage of front end studies of an Iron Ore Project, the sizing of surge capacities
and stockpiles are normally assumed based on the experience of the study team …

Economic advantages of dynamic analysis in the early stages of mining projects

DT Cremonese, T Marin, GD Tomi - REM-International Engineering …, 2018 - SciELO Brasil
The use of dynamic simulation is technically advantageous for the project as shown by
various authors. However, is it economically advantageous in the early stages of the project …

A high-level dynamic analysis approach for studying global process plant availability and production time in the early stages of mining projects.

D Travagini Cremonese, B Karanth… - REM-International …, 2017 - search.ebscohost.com
In the early stage of front-end studies of a Mining Project, the global availability (ie number of
hours a plant is available for production) and production (number of hours a plant is actually …