Single machine multi-product capacitated lot sizing with sequence-dependent setups

B Almada-Lobo, D Klabjan… - … Journal of Production …, 2007 - Taylor & Francis
In production planning in the glass container industry, machine-dependent setup times and
costs are incurred for switch overs from one product to another. The resulting multi-item …

Lead time considerations for the multi-level capacitated lot-sizing problem

C Almeder, D Klabjan, R Traxler… - European Journal of …, 2015 - Elsevier
The classical multi-level capacitated lot-sizing problem formulation is often not suitable to
correctly capture resource requirements and precedence relations. Depending on lead time …

[HTML][HTML] A capacitated lot-sizing model with sequence-dependent setups, parallel machines and bi-part injection moulding

J Mula, M Díaz-Madroñero, B Andres, R Poler… - Applied Mathematical …, 2021 - Elsevier
This paper aims to propose a model for solving a capacitated lot-sizing problem with
sequence-dependent setups (CLSD) and parallel machines in a bi-part injection moulding …

[图书][B] Production and inventory management with substitutions

JC Lang - 2009 - books.google.com
Quantitativeapproachesforsolvingproductio… problems in industry have gained growing
importance in the past years. Due to the increasinguse of AdvancedPlanningSystems, a …

Neighbourhood search meta-heuristics for capacitated lot-sizing with sequence-dependent setups

B Almada-Lobo, RJW James - International Journal of Production …, 2010 - Taylor & Francis
We address a problem that often arises in industry, the multi-item capacitated-lot-sizing and
scheduling problem with sequence-dependent setup times and costs. Powerful commercial …

Synchronisation of scarce resources for a parallel machine lotsizing problem

C Almeder, B Almada-Lobo - International Journal of Production …, 2011 - Taylor & Francis
In this paper we present a novel approach to tackling the synchronisation of a secondary
resource in lot-sizing and scheduling problems. This kind of problem occurs in various …

On production planning and scheduling in food processing industry: Modelling non-triangular setups andproduct decay

GDH Claassen, JC Gerdessen, EMT Hendrix… - Computers & Operations …, 2016 - Elsevier
Production planning and scheduling in food processing industry (FPI) requires taking
specific characteristics into account. First of all, setups are usually sequence-dependent and …

Sustainability in a lot-sizing and scheduling problem with delivery time window and sequence-dependent setup cost consideration

P Vaez, F Sabouhi, MS Jabalameli - Sustainable Cities and Society, 2019 - Elsevier
Sustainability in manufacturing operations scheduling is a necessary requirement for
companies. Although this subject has attracted much attention, joint decisions of lot-sizing …

[HTML][HTML] Profit maximization in simultaneous lot-sizing and scheduling problem

N Sereshti, M Bijari - Applied Mathematical Modelling, 2013 - Elsevier
This paper extends the simultaneous lot-sizing and scheduling problem, to include demand
choice flexibility. The basic assumption in most research about lot-sizing and scheduling …

Lecture Notes in Economics and Mathematical Systems 591

M Beckmann, HP Künzi, G Fandel, W Trockel - 1974 - Springer
Almost all economic activities in modern societies are scattered through space and time.
Transport processes, as a consequence, pervade everyday life and they have deep impact …