[图书][B] Project management with dynamic scheduling

M Vanhoucke - 2012 - Springer
Project scheduling began as a research track within the mathematical field of Operations
Research in order to determine start and finish times of project activities subject to …

[HTML][HTML] Interaction analysis for vision-based activity identification of earthmoving excavators and dump trucks

J Kim, S Chi, J Seo - Automation in Construction, 2018 - Elsevier
Activity identification is an essential step to measure and monitor the performance of
earthmoving operations. Many vision-based methods that automatically capture and explain …

The combination of last planner system and location-based management system

O Seppänen, G Ballard, S Pesonen - Lean construction journal, 2010 - research.aalto.fi
Abstract Research Question: The Last Planner System (LPS) and Location-Based
Management System (LBMS) both aim to achieve the lean goals of decreasing waste …

Optimization time-cost-quality-work continuity in construction management using mutation–crossover slime mold algorithm

PVH Son, LNQ Khoi - Applied Soft Computing, 2023 - Elsevier
This study presents the mutation–crossover slime mold algorithm (MCSMA) to balance the
time, cost, quality, and work continuity in a particular construction project. The slime mold …

Optimizing resource utilization for repetitive construction projects

K El-Rayes, O Moselhi - Journal of construction engineering and …, 2001 - ascelibrary.org
Optimizing resource utilization can lead to significant reduction in the duration and cost of
repetitive construction projects such as highways, high-rise buildings, and housing projects …

Optimal planning and scheduling for repetitive construction projects

K Hyari, K El-Rayes - Journal of Management in Engineering, 2006 - ascelibrary.org
This paper presents a multiobjective optimization model for the planning and scheduling of
repetitive construction projects. The model enables construction planners to generate and …

Scheduling repetitive construction projects: Structured literature review

M Tomczak, P Jaśkowski - Journal of Civil Engineering and Management, 2022 - jest.vgtu.lt
Construction projects that involve repetitive operations are often referred to as repetitive
construction projects. Scheduling them proves a task more demanding than in the case of …

Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling

M Rogalska, W Bożejko, Z Hejducki - Automation in Construction, 2008 - Elsevier
This paper deals with construction project scheduling. In the literature on the subject one
can find such scheduling methods as: the Linear Scheduling Model (LSM), Line of Balance …

Multiobjective evolutionary finance-based scheduling: Individual projects within a portfolio

A Elazouni, M Abido - Automation in Construction, 2011 - Elsevier
Under cash-constrained conditions, the fulfillment of cash demands of the ongoing projects
within a contractor's portfolio constitutes a set of conflicting objectives. As the profit values of …

The discrete time/cost trade-off problem: extensions and heuristic procedures

M Vanhoucke, D Debels - Journal of Scheduling, 2007 - Springer
Time/cost trade-offs in project networks have been the subject of extensive research since
the development of the critical path method (CPM) in the late 50s. Time/cost behaviour in a …