Single-item dynamic lot-sizing problems: An updated survey

N Brahimi, N Absi, S Dauzère-Pérès, A Nordli - European Journal of …, 2017 - Elsevier
Following our previous paper (Brahimi, Dauzère-Pérès, Najid, & Nordli, 2006), we present
an updated and extended survey of Single-Item Lot-Sizing Problems with focus on …

A bibliography of non-deterministic lot-sizing models

MA Aloulou, A Dolgui, MY Kovalyov - International Journal of …, 2014 - Taylor & Francis
Non-deterministic lot-sizing models are considered which serve for an explicit determination
of lot sizes in an uncertain environment. Taxonomy components for such models are …

Comparison of fuzzy inference system (FIS), FIS with artificial neural networks (FIS+ ANN) and FIS with adaptive neuro-fuzzy inference system (FIS+ ANFIS) for …

P Aengchuan, B Phruksaphanrat - Journal of Intelligent Manufacturing, 2018 - Springer
Conventional inventory models mostly cope with a known demand and adequate supply, but
are not realistic for many industries. In this research, the fuzzy inference system (FIS) model …

Robust material requirement planning with cumulative demand under uncertainty

R Guillaume, C Thierry, P Zieliński - International Journal of …, 2017 - Taylor & Francis
In this paper, we deal with the problem of tactical capacitated production planning with the
demand under uncertainty modelled by closed intervals. We propose a single-item with …

An effective multi-objective particle swarm optimization for the multi-item capacitated lot-sizing problem with set-up times and backlogging

H Ben Ammar, O Ayadi, F Masmoudi - Engineering Optimization, 2020 - Taylor & Francis
In this article, a multi-item capacitated lot-sizing problem (MICLSP) with consideration of set-
up times and backlogging, which is one of the key issues in production planning, is …

[HTML][HTML] Management of the risk of backorders in a MTO–ATO/MTS context under imperfect requirements

R Guillaume, B Grabot, C Thierry - Applied Mathematical Modelling, 2013 - Elsevier
Production systems are often classified according to the way production is released, eg
make-to-stock (MTS), make-to-order (MTO), assembly-to-order (ATO) or engineer-to-order …

Decision support with ill-known criteria in the collaborative supply chain context

R Guillaume, G Marques, C Thierry, D Dubois - Engineering Applications of …, 2014 - Elsevier
In the field of Supply Chain Risk Management, the attitude of managers toward risk affect the
tactical decision-making process in collaborative supply chains under an uncertain …

MRP parameter evaluation under fuzzy lead times

OB Ammar, R Guillaume, C Thierry - IFAC-PapersOnLine, 2016 - Elsevier
One of the main problems in supply chains is the supply planning of an actor (customer) in
function of others network actors (suppliers). In this context, the knowledge of the supplier …

A possibilistic model for production planning with uncertain demand

ML Cunico, A Vecchietti - European Journal of Industrial …, 2020 - inderscienceonline.com
This article proposes a possibilistic model of production planning problem of a
manufacturing company using a fuzzy representation of uncertainties in demand. An …

Robust inventory problem with budgeted cumulative demand uncertainty

R Guillaume, A Kasperski, P Zieliński - Optimization Letters, 2022 - Springer
In this paper, a robust inventory problem with uncertain cumulative demands is considered.
Interval-budgeted uncertainty sets are used to model possible cumulative demand …