Factors affecting construction productivity: a 30 year systematic review

A Hasan, B Baroudi, A Elmualim… - Engineering …, 2018 - emerald.com
Purpose A significant amount of work has been performed in the area of identification of
factors affecting construction productivity. Previous studies have tried to determine the most …

Identification of causes and effects of poor communication in construction industry: A theoretical review

Y Gamil, IA Rahman - Emerging Science Journal, 2017 - ijournalse.org
Construction industry is characterized in nature as complex, fragmented, dynamic and
involves many parties therefore effective communication is essential to overcome these …

[HTML][HTML] Automated detection of contractual risk clauses from construction specifications using bidirectional encoder representations from transformers (BERT)

S Moon, S Chi, SB Im - Automation in Construction, 2022 - Elsevier
Detecting contractual risk information from construction specifications is crucial to
succeeding in construction projects. This paper describes clause classification using the …

The effect of relationship management on project performance in construction

X Meng - International journal of project management, 2012 - Elsevier
Construction projects often suffer from poor performance in terms of time delays, cost
overruns and quality defects. The causes of poor performance have often been analysed …

Studying the relationship between causes and effects of poor communication in construction projects using PLS-SEM approach

Y Gamil, I Abd Rahman - Journal of Facilities Management, 2023 - emerald.com
Purpose The purpose of this paper is to develop a structural relationship model to study the
relationship between causes and effects of poor communication and information exchange …

A framework for proactive construction defect management using BIM, augmented reality and ontology-based data collection template

CS Park, DY Lee, OS Kwon, X Wang - Automation in construction, 2013 - Elsevier
In construction process, defects occur inevitably and repeatedly. It is one of the primary
causes of project schedule and cost overruns. Many studies on defect causation analysis …

A digital construction framework integrating building information modeling and reverse engineering technologies for renovation projects

Z Ding, S Liu, L Liao, L Zhang - Automation in construction, 2019 - Elsevier
This study proposes a digital construction framework that integrates building information
modeling (BIM) and reverse engineering (RE) to improve information utilization in different …

A framework for dimensional and surface quality assessment of precast concrete elements using BIM and 3D laser scanning

MK Kim, JCP Cheng, H Sohn, CC Chang - Automation in construction, 2015 - Elsevier
This study presents a systematic and practical approach for dimensional and surface quality
assessment of precast concrete elements using building information modeling (BIM) and 3D …

Influence of project type and procurement method on rework costs in building construction projects

PED Love - Journal of construction engineering and management, 2002 - ascelibrary.org
While it is widely recognized that additional costs due to rework can have an adverse effect
on project performance, limited empirical research has been done to investigate the …

Critical management practices influencing on-site waste minimization in construction projects

SO Ajayi, LO Oyedele, M Bilal, OO Akinade, HA Alaka… - Waste management, 2017 - Elsevier
As a result of increasing recognition of effective site management as the strategic approach
for achieving the required performance in construction projects, this study seeks to identify …