Prediction and Observation of a Los Angeles Metro Red Line Subway Tunnel's Response to Adjacent Deep Excavation

Y Sun, MB Hudson, JT Waggoner… - Geotechnical and …, 2016 - ascelibrary.org
The Wilshire Grand redevelopment project in downtown Los Angeles includes demolition of
a 16-story hotel and construction of a new 73-story tower. Construction of the basement and …

[PDF][PDF] Evaluation and Construction Impact of a Deep Excavation for the 73-story Wilshire Grand Tower on the Existing Metro Red Line Tunnels in Downtown Los …

J Yao, MR Crow, Y Sun, JT Waggoner, RG Mikola… - researchgate.net
ABSTRACT The Wilshire Grand redevelopment project in downtown Los Angeles includes
construction of a new 73-story tower. Construction required excavation up to 93 feet deep …

Monitoring of Los Angeles Metro Red Line Subway: Earthquake Response Adjacent to Deep Excavation

MB Hudson, M Lew - … China-Japan-US Trilateral Symposium on …, 2016 - ascelibrary.org
ABSTRACT The Los Angeles Metro Red Line subway tunnels in Los Angeles, California,
are important transportation lifelines and are currently operating adjacent to the Wilshire …

A Case Study of The Performance of A Pile-Supported Bracing Method for Basement Building

MA Uddin, M Rahman - International Journal of Engineering and …, 2024 - dergipark.org.tr
Deep excavations in urban areas are highly hazardous due to extensive settling of the
surrounding soil, which can lead to the failure of retaining wall systems and the consequent …