Decision making under uncertainty in energy systems: State of the art

A Soroudi, T Amraee - Renewable and Sustainable Energy Reviews, 2013 - Elsevier
The energy system studies include a wide range of issues from short term (eg real-time,
hourly, daily and weekly operating decisions) to long term horizons (eg planning or policy …

Maintenance scheduling in the electricity industry: A literature review

A Froger, M Gendreau, JE Mendoza, É Pinson… - European Journal of …, 2016 - Elsevier
The reliability of the power plants and transmission lines in the electricity industry is crucial
for meeting demand. Consequently, timely maintenance plays a major role reducing …

Multi-objective reliability-redundancy allocation problem using particle swarm optimization

H Garg, SP Sharma - Computers & Industrial Engineering, 2013 - Elsevier
This paper considers the multi-objective reliability redundancy allocation problem of a series
system where the reliability of the system and the corresponding designing cost are …

Soft computing approach for reliability optimization: State-of-the-art survey

M Gen, YS Yun - Reliability Engineering & System Safety, 2006 - Elsevier
In the broadest sense, reliability is a measure of performance of systems. As systems have
grown more complex, the consequences of their unreliable behavior have become severe in …

A wavelet-fuzzy combined approach for classification and location of transmission line faults

MJ Reddy, DK Mohanta - International Journal of Electrical Power & Energy …, 2007 - Elsevier
This paper presents a real-time wavelet-Fuzzy combined approach for digital relaying. The
algorithm for fault classification employs wavelet multi resolution analysis (MRA) to …

Adaptive-neuro-fuzzy inference system approach for transmission line fault classification and location incorporating effects of power swings

MJ Reddy, DK Mohanta - IET generation, transmission & distribution, 2008 - IET
In the present milieu, changes in regulations and the opening of power markets have
manifested in the form of large amount of power transfer across transmission lines with …

Performance evaluation of an adaptive-network-based fuzzy inference system approach for location of faults on transmission lines using Monte Carlo simulation

MJB Reddy, DK Mohanta - IEEE Transactions on Fuzzy …, 2008 - ieeexplore.ieee.org
This paper employs a wavelet multiresolution analysis (MRA) along with the adaptive-
network-based fuzzy inference system to overcome the difficulties associated with …

Deterministic and stochastic approach for safety and reliability optimization of captive power plant maintenance scheduling using GA/SA-based hybrid techniques: A …

DK Mohanta, PK Sadhu, R Chakrabarti - Reliability Engineering & System …, 2007 - Elsevier
This paper presents a comparison of results for optimization of captive power plant
maintenance scheduling using genetic algorithm (GA) as well as hybrid GA/simulated …

A real time methodology of cluster-system theory-based reliability estimation using k-means clustering

W Cai, J Zhao, M Zhu - Reliability Engineering & System Safety, 2020 - Elsevier
With rapidly increase in the design and application of complex system engineering, life and
reliability analysis methods for these engineering have received much attention. A novel real …

Generator maintenance scheduling based on the risk of power generating unit failure

J Eygelaar, DP Lötter, JH Van Vuuren - … journal of electrical power & energy …, 2018 - Elsevier
A power utility's ability to satisfy energy demand can be influenced significantly by
unexpected breakdowns of power generating units. In most cases, such unexpected failures …