Summary of the first fully operational run of LINAC4 at CERN

P Skowroński, R Scrivens, BP Bielawski, J Parra-Lopez… - JACoW IPAC, 2022 - cds.cern.ch
In December 2020 the newly commissioned LINAC4 started delivering beam for the CERN
proton accelerator chain, replacing the old LINAC2. LINAC4 is a 352 MHz normal …

CERN's Super Proton Synchrotron 200 MHz cavity regulation upgrade: Modeling, design optimization, and performance estimation

T Mastoridis, P Baudrenghien - Physical Review Accelerators and Beams, 2022 - APS
CERN's Super Proton Synchrotron (SPS) accelerates protons to 4 5 0 GeV/c and transfers
them into the Large Hadron Collider (LHC). It is currently one of the limiting factors in …

[HTML][HTML] A new beam synchronous processing architecture with a fixed frequency processing clock. Application to transient beam loading compensation in the CERN …

FJG Guarch, P Baudrenghien, JMM Arostegui - Nuclear Instruments and …, 2021 - Elsevier
New projects being implemented or planned at CERN, such as the LHC Injectors Upgrade
(LIU), the High-Luminosity LHC (HL-LHC) or the Future Circular Collider (FCC), motivate the …

Recent developments in LLRF and its controls at CERN Linac4

B Bielawski, P Baudrenghien, R Borner - arXiv preprint arXiv:1909.12541, 2019 - arxiv.org
At the end of the Large Hadron Collider's Run 2, CERN's Proton Injector Linac 2,
commissioned in 1978, delivered its final beam in December 2018. For Run 3, from March …

Cavity field control for linear particle accelerators

O Troeng - 2019 - portal.research.lu.se
High-energy linear particle accelerators enable exploration of the microscopic structure of
pharmaceuticals, solar cells, fuel cells, high-temperature superconductors, and the universe …

JACOW: Low Level RF Control Algorithms for the CERN Proton LINAC4

P Baudrenghien, R Borner, BP Bielawski - JACoW LINAC, 2022 - cds.cern.ch
Abstract The CERN Linac4 Low Level RF (LLRF) uses a Linear Quadratic Gaussian
regulator and an Adaptive Feed Forward to stabilize the accelerating field in the cavities in …

Digital hardware architectures for beam synchronous processing and RF synchronization of particle accelerators

FJ Galindo Guarch - 2021 - upcommons.upc.edu
In Particle Accelerators, the Low-Level RF (LLRF) is the control system of the RF, and in the
end, of the purpose of the machine, that is the energy transfer and acceleration of particles. It …

Commissioning and Operational Experience Gained with the Linac4 RFQ at CERN

C Rossi, O Piquet, M Desmons, O Brunner… - 2014 - cds.cern.ch
The installation of Linac4 has started in 2013 with the 3 MeV Front End, aiming at delivering
a fully commissioned 160 MeV H^{−} beam by 2016. During summer 2013 the H^{−} ion …

[PDF][PDF] Low Level RF Control Algorithms for the CERN LINAC4

P Baudrenghien, R Borner, B Bielawski - jacow.org
Voltage (Antenna Sum) Left: performance measured with PI controller (2017), 12 mA DC
(45.42 ns/sample) Right: idem measured with LQG regulation (2019), 25 mA DC The pk-pk …

JACoW: Linac4: From Initial Design to Final Commissioning

A Lombardi - 2017 - cds.cern.ch
This talk reviews the design, construction, and commissioning effort of CERN's new proton
linear accelerator, Linac4, which has recently been commissioned and which is presently …