Enhancement of biological nutrient removal process with advanced process control tools in full-scale wastewater treatment plant

J Palatsi, F Ripoll, A Benzal, M Pijuan… - Water Research, 2021 - Elsevier
One of the major challenges in existing WasteWater Treatment Plants (WWTPs) is to comply
with the increasingly stringent nutrient discharge limits established by the competent …

Removal of ammonia nitrogen and phosphorus by porous slow-release Ca2+ ceramsite prepared from industrial solid wastes

C Ou, J Wang, W Yang, Y Bao, Z Liao, J Shi… - Separation and …, 2023 - Elsevier
An environmentally friendly ceramsite with slow-release ability was prepared using
industrial solid wastes through sintering method. Ca 2+ release was mainly evoked by …

Long-term performance of a full-scale intermittently decanted extended aeration (IDEA) plant: The effect of dissolved oxygen and the relocation of alum dosing to …

S Song, KY Cheng, B Yong, MP Ginige - Journal of Environmental …, 2022 - Elsevier
Dosing alum to remove phosphorus (P) from wastewater is a common practice. However,
the dosing-location and quantity of alum required to meet P discharge limits are vaguely …