Resource flow network generation algorithm in robust project scheduling

Y Shi, H Su, N Pang - Journal of the Operational Research Society, 2021 - Taylor & Francis
The research of project scheduling based on resource flow network provides a new
approach for studying project scheduling. And the stability of resource flow network also …

CIGI2011: A heuristic method for resource-constrained project scheduling with activity overlapping

L Grèze, R Pellerin, P Leclaire, N Perrier - Journal of Intelligent …, 2014 - Springer
The overlapping of activities is a common practice to accelerate the execution of
engineering projects. This technique consists in executing in parallel two activities, normally …

Modelling and simulation of the task scheduling behavior in collaborative product development process

X Zhang, Y Li, S Zhang… - Integrated Computer …, 2013 - content.iospress.com
Abstract Collaborative Product Development (CPD) process is characterized by autonomous
task control, dynamic task sequence, and frequent team collaboration, which endow the …

面向协同产品开发过程的多主体资源配置

李英姿, 张硕, 张晓冬 - 计算机集成制造系统, 2013 - cims-journal.cn
协同产品开发过程具有分布性, 冲突性和协作性等显著特点, 这些特点增加了该过程中动态资源
配置的复杂性和不确定性. 针对这一问题, 首先提出一种面向协同产品开发过程的两阶段多主体 …

Experimental evaluation of overlapping strategy for the multimode Resource-Constrained project scheduling problem

Z Chu, Z Xu, F Xie - Arabian Journal for Science and Engineering, 2019 - Springer
Reduction in project completion time is important in today's competitive environment. This
paper presents a solution to the realistic problem of scheduling activities to minimize the …

集团制造多主体外协订单任务制造资源配置

杜百岗, 郭顺生, 彭兆, 李益兵, 唐红涛 - 计算机集成制造系统, 2015 - cims-journal.cn
集团制造企业的外协订单任务制造资源配置过程具有多主体, 多任务, 多资源,
多工序以及协同性的特点, 增加了订单制造资源配置过程的复杂性和不确定性. 针对这一问题 …

Hybrid method for solving flexible open shop scheduling problem with simulated annealing algorithm and multi-agent approach

T Witkowski, P Antczak, A Antczak - Advanced Materials Research, 2012 - Trans Tech Publ
In this study we propose metaheuristic optimization algorithm, in which simulated annealing,
multi agent approach with fuzzy logic are used. On the first level of solution search the multi …

[图书][B] Une méthode heuristique pour l'ordonnancement de projets avec contraintes de ressources et chevauchement d'activités

L Grèze, R Pellerin, P Leclaire, N Perrier - 2012 - cirrelt.ca
Le chevauchement d'activités est une pratique courante pour accélérer l'exécution de
projets d'ingénierie. Cette technique consiste à exécuter en parallèle deux activités …

[引用][C] Recent Developments of Computational Intelligence for Resource Constrained Project Scheduling Problems: A Taxonomy and Review

OS Soliman, EA Elgendi - International Journal of Advanced Research in …, 2014

[引用][C] Ant Colony Optimization Module for Scheduling of Resource Constrained Construction Project

J Thomas, BC Kovoor, J Jose, K CE - Project Management Research–The Master …, 2012