Implementing nuclear power plants (NPPs): state of the art, challenges, and opportunities

H Elhegazy, M Kamal - Innovative Infrastructure Solutions, 2022 - Springer
Energy savings are a key issue in modern society. Nuclear energy may be a solution to
provide clean power. Nuclear power plants (NPPs) use nuclear fission to generate …

Front end projects benefits realisation from a requirements management perspective—A systematic literature review

J Serugga, M Kagioglou, P Tzortzopoulos - Buildings, 2020 - mdpi.com
The recent notable emergence of a body of research in requirements management on one
hand and benefits realisation has contributed to addressing a growing need for improved …

Analysis of the earned value management and earned schedule techniques in complex hydroelectric power production projects: Cost and time forecast

P Urgilés, J Claver, MA Sebastián - Complexity, 2019 - Wiley Online Library
All projects take place within a context of uncertainty. That is especially noticeable in
complex hydroelectric power generation projects, which are affected by factors such as the …

International project risk management for nuclear power plant (NPP) construction: Featuring comparative analysis with fossil and gas power plants

M Kim, I Lee, Y Jung - Sustainability, 2017 - mdpi.com
The concern of risk management has continuously increased in international construction
projects. International projects have a high level of risk and complexity, which results in …

Risk modeling at the pre-investment phase of nuclear powerplant construction on the international market

П Грабовый, В Березка - Недвижимость: экономика, управление, 2021 - n-eu.iasv.ru
The statistical data, covering the recent ten-year period, illustrates the level of uncertainty
and problems arising in this area. Over 60% of nuclear reactors worldwide are built with a …

Unified breakdown structure for information integration to enhance interoperability in the built environment

DD Gebremichael, H Lee, Y Lee… - Journal of Computing in …, 2022 - ascelibrary.org
Advanced information technologies provide an opportunity to radically improve the business
process of the architecture, engineering, construction, and operations (AECO) industry. The …

[PDF][PDF] Development of risk-based standardized WBS (Work Breakdown Structure) for quality planning of flyover works

M Pratita, Y Latif - Proceedings of the International Conference on …, 2018 - ieomsociety.org
Abstract Work Breakdown Structure (WBS) is a breakdown of project works into smaller
components so it can be better managed. It is also known that the quality of project works is …

Assessment methodology of practical configuration management (CM) for sustainable nuclear power plants (NPPs)

MY Kang, Y Jeong, Y Jung - Sustainability, 2019 - mdpi.com
Since the Fukushima accident in 2011, nuclear safety has emerged as a very important
political and social issue. Under this circumstance, the importance of configuration …

[PDF][PDF] Utilization of artificial intelligence in the analysis of nuclear power plant requirements

S Myllynen - 2019 - aaltodoc.aalto.fi
Nuclear power plant projects are often characterized by two factors: they are time-
consuming and capital-intensive. These current challenges include descriptive and non …

Metodología para el seguimiento y control de proyectos complejos de construcción. Aplicación en el sector hidroenergético

U Buestán, P Teodoro - 2019 - e-spacio.uned.es
Un proyecto de construcción complejo, está constituido por muchos componentes
interrelacionados e interdependientes. Los componentes que conforman estos proyectos …