[PDF][PDF] Control and Operation of a Wideband RF System in CERN's PS Booster

ME Angoletta, J Sanchez-Quesada - Proc. IPAC'17, 2017 - inspirehep.net
A prototype wideband High-Level RF (HLRF) system based on Finemet metal alloy has
been installed in CERN's PS Booster (PSB) Ring 4 in 2012, within the frame of the LHC …

[PDF][PDF] Commissioning and Results of the Half-Sector Test Installation with 160 MeV H Beam from Lin--ac4

B Mikulec, D Aguglia, J Allica Santamaria, C Baud… - Proc. IPAC'17, 2017 - jacow.org
Abstract During the Long Shutdown 2 (LS2) at CERN in 2019/20, the Proton Synchrotron
Booster (PSB) will undergo a profound upgrade in the framework of the LHC Injector …

Development of a Real-Time Magnetic Field Measurement System for Synchrotron Control

J Vella Wallbank, M Amodeo, A Beaumont, M Buzio… - Electronics, 2021 - mdpi.com
The precise knowledge of the magnetic field produced by dipole magnets is critical to the
operation of a synchrotron. Real-time measurement systems may be required, especially in …

A Radiation-Hard Zero Degree Calorimeter for ATLAS in the HL-LHC era

C ATLAS - 2021 - cds.cern.ch
Abstract Run 4 Heavy Ion program of the LHC offers great physics opportunities to ATLAS.
The ZDC are increasingly important for characterizing A+ A, p+ A, γ+ A and γ+ γ collisions …

[PDF][PDF] Operational experience with the new digital low-level RF system for CERN's PS Booster

ME Angoletta, S Albright, A Findlay… - 8th Int. Particle …, 2017 - accelconf.web.cern.ch
The four rings of CERN's PS Booster have been equipped in 2014 with a new digital low-
level RF (LLRF) system based upon a new, in-house developed LLRF family. This is a …

Electron cloud formation in CERN particle accelerators and its impact on the beam dynamics

A Romano - 2018 - cds.cern.ch
In high energy accelerators operating with positively charged particles, photoemission and
secondary emission can give rise to an exponential electron multiplication within the beam …

[PDF][PDF] First operational results of new real-time magnetic measurement systems for accelerator control

S Albright, M Bonora, M Buzio, H Damerau… - Proc. IPAC'23, Venice …, 2023 - inspirehep.net
A new real-time measurement system for accelerator control to measure the integrated
bending field, called FIRESTORM (Field In Real-time Streaming from Online Reference …

Development of a test DAQ system for the CMS Phase-2 outer tracker upgrade

M Haranko - 2019 - cds.cern.ch
The CMS detector at the LHC is foreseen to experience a major upgrade in order to cope
with increased radiation flux due to the high-luminosity operation phase of the accelerator …

[PDF][PDF] Operational experience and reliability of the new CERN Linac4

E Sargsyan, AM Lombardi, G Bellodi, JB Lallement… - Proc. Linac - inspirehep.net
Since its completion in 2017, Linac4, the new 160 MeV proton injector for the CERN
accelerator complex, has undergone some tests to assess and improve reliability, until being …

Understanding of the CERN-SPS horizontal instability with multiple bunches

C Zannini, B Salvant, G Rumolo, E Métral, L Carver… - JACoW HB, 2022 - cds.cern.ch
At the end of 2018, an instability with multiple bunches has been consistently observed
during high intensity studies at the CERN-SPS. This instability could be a significant …