Mixed integer programming based maintenance scheduling for the Hunter Valley coal chain

N Boland, T Kalinowski, H Waterer, L Zheng - Journal of Scheduling, 2013 - Springer
We consider the scheduling of the annual maintenance for the Hunter Valley Coal Chain.
The coal chain is a system comprising load points, railway track and different types of …

Scheduling network maintenance jobs with release dates and deadlines to maximize total flow over time: Bounds and solution strategies

N Boland, T Kalinowski, S Kaur - Computers & Operations Research, 2015 - Elsevier
We consider a problem that marries network flows and scheduling, motivated by the need to
schedule maintenance activities in infrastructure networks, such as rail or general logistics …

Long-term maintenance optimization for integrated mining operations

Y Yang, R Loxton, AL Rohl, HT Bui - Optimization and Engineering, 2023 - Springer
Maintenance activities are inevitable and costly in integrated mining operations. Conducting
maintenance may require the whole system, or sub-units of the system, to be shut down …

Scheduling arc shut downs in a network to maximize flow over time with a bounded number of jobs per time period

N Boland, T Kalinowski, S Kaur - Journal of Combinatorial Optimization, 2016 - Springer
We study the problem of scheduling maintenance on arcs of a capacitated network so as to
maximize the total flow from a source node to a sink node over a set of time periods …

Maintenance scheduling in a railway corricdor

S Eskandarzadeh, T Kalinowski, H Waterer - arXiv preprint arXiv …, 2019 - arxiv.org
We investigate a novel scheduling problem which is motivated by an application in the
Australian railway industry. Given a set of maintenance jobs and a set of train paths over a …

Network Maintenance Scheduling with Maintenance Resource Constraints

J Li, L Zheng, X Tang - 2022 IEEE International Conference on …, 2022 - ieeexplore.ieee.org
Preventive maintenance is the main cause of interruptions of many real-world systems, such
as communication, energy and logistics networks. Proper maintenance scheduling can …

The network maintenance problem on an arc with uncapacitated repair

P Charkhgard, T Kalinowski… - … International Congress on …, 2019 - rune.une.edu.au
The network maintenance problem is motivated by the need to maintain infrastructure
networks over time. We consider networks in which a commodity is transported between …

[PDF][PDF] Arc shutdown scheduling in a capacitated network to maximize flow over time

S Kaur - 2015 - nova.newcastle.edu.au
Many real world complex systems such as telecommunication systems, production systems
and water supply networks can often be modelled as capacitated flow networks. Such …

[PDF][PDF] The network maintenance problem

P Charkhgard, T Kalinowski… - … Congress on Modelling …, 2017 - nova.newcastle.edu.au
In this thesis, we describe an optimisation problem motivated by the need to maintain
infrastructure networks over time. We consider infrastructure networks in which a product is …

[PDF][PDF] A Hybrid Tabu Search and LP Heuristic for the Maximum Total Flow with Flexible Arc Outages

Q Xu, X Liu, L Zheng - Matheuristics 2016, 2016 - dipot.ulb.ac.be
We present a hybrid tabu search and integer linear programming method for the maximum
total flow with flexible arc outages (MaxTFFAO). The MaxTFFAO problem is motivated from …