Top ten intelligent algorithms towards smart manufacturing

M Zhang, F Tao, Y Zuo, F Xiang, L Wang… - Journal of Manufacturing …, 2023 - Elsevier
Intelligent algorithms can empower the development of smart manufacturing, since they can
provide optimal solutions for detection, analysis, prediction and optimization. In recent ten …

The non-permutation flow-shop scheduling problem: a literature review

DA Rossit, F Tohmé, M Frutos - Omega, 2018 - Elsevier
Abstract The Non-Permutation Flow-Shop scheduling problem (NPFS) is a generalization of
the traditional Permutation Flow-Shop scheduling problem (PFS) that allows changes in the …

Improving configuration of complex production lines via simulation-based optimization

MF Yegul, FS Erenay, S Striepe, M Yavuz - Computers & Industrial …, 2017 - Elsevier
Optimizing the configuration of a complex production line is an NP-hard problem in various
machine settings. Solving real-life-size instances of this problem becomes a more common …

Fast heuristics for minimizing the makespan in non-permutation flow shops

AJ Benavides, M Ritt - Computers & Operations Research, 2018 - Elsevier
We introduce a new permutation representation for non-permutation schedules, and show
how the acceleration technique of Taillard can be extended to it. We propose three new …

Flow shop scheduling with heterogeneous workers

AJ Benavides, M Ritt, C Miralles - European Journal of Operational …, 2014 - Elsevier
We propose an extension to the flow shop scheduling problem named Heterogeneous Flow
Shop Scheduling Problem (Het-FSSP), where two simultaneous issues have to be resolved …

Two simple and effective heuristics for minimizing the makespan in non-permutation flow shops

AJ Benavides, M Ritt - Computers & Operations Research, 2016 - Elsevier
We propose a constructive and an iterated local search heuristic for minimizing the
makespan in the non-permutation flow shop scheduling problem. Both heuristics are based …

A constructive algorithm and a simulated annealing approach for solving flowshop problems with missing operations

M Henneberg, JS Neufeld - International Journal of Production …, 2016 - Taylor & Francis
In many practical cases of flowshop environments and especially in flowline manufacturing
cells, some or all jobs may not require processing on all machines. Hence, this paper …

Ant colony optimisation algorithms for two-stage permutation flow shop with batch processing machines and nonidentical job sizes

X Zheng, S Zhou, H Chen - International Journal of Production …, 2019 - Taylor & Francis
This paper focuses on minimising the maximum completion time for the two-stage
permutation flow shop scheduling problem with batch processing machines and …

[PDF][PDF] 煤岩交界面对水力压裂裂缝扩展的影响

宋晨鹏, 卢义玉, 贾云中, 夏彬伟 - 东北大学学报(自然科学版), 2014 - xuebao.neu.edu.cn
针对井下煤层压裂过程中, 压裂裂缝扩展至煤岩交界面处, 受多种力学因素的综合影响,
扩展方向可能会发生偏转. 通过建立压裂裂缝遇煤岩交界面二维模型, 采用理论分析结合数值 …

Dynamic set-up rules for hybrid flow shop scheduling with parallel batching machines

A Rossi, A Pandolfi, M Lanzetta - International Journal of …, 2014 - Taylor & Francis
An S-stage hybrid (or flexible) flow shop, with sequence-independent uniform set-up times,
parallel batching machines with compatible parallel batch families (like in casting or heat …