Investigating the impact of TBM downtimes on utilization factor based on sensitivity analysis

A Khetwal, J Rostami, PP Nelson - Tunnelling and underground space …, 2020 - Elsevier
Tunnel boring machines (TBMs) are considered to be the most efficient tunneling method for
long tunnels because of their higher productivity, adaptability to a variety of subsurface …

Comparison between discrete event simulation approach and various existing empirically-based models for estimation of TBM utilization

A Khetwal, J Rostami, O Frough, PP Nelson - Tunnelling and Underground …, 2021 - Elsevier
The fundamental components in predicting the TBM performance (advance rate) are the rate
of penetration and utilization. Extensive studies have been conducted to accurately estimate …

Understanding the effect of geology-related delays on performance of hard rock TBMs

A Khetwal, J Rostami, PP Nelson - Acta Geotechnica, 2022 - Springer
Underground construction has become a necessity considering social, technological,
economical, and sustainable advancements in society. Tunnel boring machines (TBMs) can …

Geotechnical variability assessment in utilization estimation for hard rock TBMs

A Khetwal, J Rostami, PP Nelson - ARMA US Rock Mechanics …, 2021 - onepetro.org
The underground construction demand is rising driven by social, technological, economical,
and sustainable issues and opportunities. A tunnel boring machine (TBMs) can be …

Examining the Possibility of Estimating Activity Time Distributions from Recorded Downtimes in Tbm Tunnelling Operations Using Discrete Event Simulation (Des) …

H Kumas - 2022 - search.proquest.com
While the tunnel boring machines (TBMs) have been broadly accepted by tunneling
industry, the calculation of TBM advance rates has always been a challenge in setting …

Evaluating the Impacts of Crew Experience and Selected Activities on Utilization of Hard Rock Tunnel Boring Machines (TBMs)

R O'Connell - 2021 - search.proquest.com
Estimating utilization rate is a critical factor for predicting performance of tunnel boring
machines (TBM). The process of estimating machine performance, including rate of …

Vintage TBM Cuts Months Off Schedule in San Antonio

C Edwards, R Webb - North American Tunneling 2022 …, 2022 - books.google.com
5 miles of soft ground tunnel excavation for the SAWS W‑6 project finished months early
despite difficult conditions. Success was achieved using TBMs and other equipment built …

Effect of Muck Transportation System on Overall TBM Performance and Downtimes

A Khetwal, J Rostami, PP Nelson - Rapid Excavation and …, 2021 - books.google.com
Tunnel boring machines (TBMs) can be considered as the method of choice for tunneling in
many projects due to the high level of efficiency and high potential productivity, safety, and …

[PDF][PDF] Technical Session IV: New Technology & Extreme Tunneling

M Greger, S Konda, M Sugimoto, J Chen, K Kayukawa… - researchgate.net
Estimating of TBM utilization factor (U) is one of the challenges in mechanized tunneling.
Utilization factor is determined by combined effect of tunnel geology, machine specification …