A survey of hybrid metaheuristics for the resource-constrained project scheduling problem

R Pellerin, N Perrier, F Berthaut - European Journal of Operational …, 2020 - Elsevier
Abstract The Resource-Constrained Project Scheduling Problem (RCPSP) is a general
problem in scheduling that has a wide variety of applications in manufacturing, production …

A genetic programming hyper-heuristic approach for the multi-skill resource constrained project scheduling problem

J Lin, L Zhu, K Gao - Expert Systems with Applications, 2020 - Elsevier
Multi-skill resource-constrained project scheduling problem (MS-RCPSP) is one of the most
investigated problems in operations research and management science. In this paper, a …

A decomposition-based multi-objective genetic programming hyper-heuristic approach for the multi-skill resource constrained project scheduling problem

L Zhu, J Lin, YY Li, ZJ Wang - Knowledge-based systems, 2021 - Elsevier
In this paper, an efficient decomposition-based multi-objective genetic programming hyper-
heuristic (MOGP-HH/D) approach is proposed for the multi-skill resource constrained project …

Memetic algorithm for solving resource constrained project scheduling problems

HF Rahman, RK Chakrabortty, MJ Ryan - Automation in Construction, 2020 - Elsevier
The resource constrained project scheduling problem (RCPSP) has a wide variety of
practical applications in construction, manufacturing, project planning, and other areas …

Automating look-ahead schedule generation for construction using linked-data based constraint checking and reinforcement learning

RK Soman, M Molina-Solana - Automation in Construction, 2022 - Elsevier
Look-ahead planning is the stage in construction planning where information from diverse
sources is integrated and plans developed for the next six/eight weeks. Poor planning of …

Multi-objective particle swarm optimization of EDM parameters to deposit HA-coating on biodegradable Mg-alloy

C Prakash, S Singh, M Singh, K Verma, B Chaudhary… - Vacuum, 2018 - Elsevier
The present research work is aimed to discuss a novel method of depositing hydroxyapatite
coats, with interconnected pores, on the surface of bio-degradable Mgsingle bondZnsingle …

Consolidated optimization algorithm for resource-constrained project scheduling problems

S Elsayed, R Sarker, T Ray, CC Coello - Information Sciences, 2017 - Elsevier
Resource-constrained project scheduling problems (RCPSPs) represent an important class
of practical problems. Over the years, many optimization algorithms for solving them have …

A hyper-heuristic based ensemble genetic programming approach for stochastic resource constrained project scheduling problem

HJ Chen, G Ding, S Qin, J Zhang - Expert Systems with Applications, 2021 - Elsevier
In project scheduling studies, to the best of our knowledge, the hyper-heuristic collaborative
scheduling is first-time applied to project scheduling with random activity durations. A hyper …

Fast GA-based project scheduling for computing resources allocation in a cloud manufacturing system

YK Lin, CS Chong - Journal of Intelligent Manufacturing, 2017 - Springer
Cloud manufacturing is becoming an increasingly popular enterprise model in which
computing resources are made available on-demand to the user as needed. Cloud …

Flexible job-shop scheduling with tolerated time interval and limited starting time interval based on hybrid discrete PSO-SA: An application from a casting workshop

H Tang, R Chen, Y Li, Z Peng, S Guo, Y Du - Applied Soft Computing, 2019 - Elsevier
In this paper, we addressed two significant characteristics in practical casting production,
namely tolerated time interval (TTI) and limited starting time interval (LimSTI). With the …