基于卷积神经网络的目标检测研究综述.

李旭冬, 叶茂, 李涛 - Application Research of Computers …, 2017 - search.ebscohost.com
随着训练数据的增加以及机器性能的提高, 基于卷积神经网络的目标检测冲破了传统目标检测的
瓶颈, 成为当前目标检测的主流算法. 因此, 研究如何有效地利用卷积神经网络进行目标检测具有 …

[HTML][HTML] Optimization of human-aware logistics and manufacturing systems: A comprehensive review of modeling approaches and applications

T Prunet, N Absi, V Borodin, D Cattaruzza - EURO Journal on …, 2024 - Elsevier
Abstract Historically, Operations Research (OR) discipline has mainly been focusing on
economic concerns. Since the early 2000s, human considerations are gaining increasing …

Minimising total tardiness for the identical parallel machine scheduling problem with splitting jobs and sequence-dependent setup times

JG Kim, S Song, BJ Jeong - International Journal of Production …, 2020 - Taylor & Francis
This paper focuses on an identical parallel machine scheduling problem with minimising
total tardiness of jobs. There are two major issues involved in this scheduling problem;(1) …

Workforce planning and production scheduling in a reconfigurable manufacturing system facing the COVID-19 pandemic

B Vahedi-Nouri, R Tavakkoli-Moghaddam… - Journal of Manufacturing …, 2022 - Elsevier
Due to the outbreak of the COVID-19 pandemic, the manufacturing sector has been
experiencing unprecedented issues, including severe fluctuation in demand, restrictions on …

Predicting Spread Probability of Learning‐Effect Computer Virus

WC Yeh, E Lin, CL Huang - Complexity, 2021 - Wiley Online Library
With the rapid development of network technology, computer viruses have developed at a
fast pace. The threat of computer viruses persists because of the constant demand for …

Scheduling uniform parallel dedicated machines with job splitting, sequence-dependent setup times, and multiple servers

HJ Kim, JH Lee - Computers & Operations Research, 2021 - Elsevier
We address a uniform parallel machine scheduling problem with machine eligibility, job
splitting, sequence-dependent setup times, and limited setup servers, which has been …

Tabu search based hybrid meta-heuristic approaches for schedule-based production cost minimization problem for the case of cable manufacturing systems

F Daneshdoost, M Hajiaghaei-Keshteli, R Sahin… - …, 2022 - content.iospress.com
This paper models and solves the scheduling problem of cable manufacturing industries that
minimizes the total production cost, including processing, setup, and storing costs. Two …

[HTML][HTML] Solving multi-objective parallel machine scheduling problem by a modified NSGA-II

S Bandyopadhyay, R Bhattacharya - Applied Mathematical Modelling, 2013 - Elsevier
In this paper, we modify a Multi-Objective Evolutionary Algorithm, known as Nondominated
sorting Genetic Algorithm-II (NSGA-II) for a parallel machine scheduling problem with three …

Multi-objective teaching-learning-based meta-heuristic algorithms to solve multi-skilled project scheduling problem

S Zabihi, MR Kahag, H Maghsoudlou… - Computers & Industrial …, 2019 - Elsevier
In this paper, a novel multi-objective multi-skilled resource-constrained project scheduling
problem based on learning effect is presented in which efficiency of the workforce is …

Hybrid genetic algorithm based on bin packing strategy for the unrelated parallel workgroup scheduling problem

B Su, N Xie, Y Yang - Journal of Intelligent Manufacturing, 2021 - Springer
In this paper we focus on an unrelated parallel workgroup scheduling problem where each
workgroup is composed of a number of personnel with similar work skills which has …