A survey on scheduling problems with due windows

A Janiak, WA Janiak, T Krysiak… - European Journal of …, 2015 - Elsevier
In this paper, a survey of scheduling problems with due windows is presented. The due
window of a job is a generalization of the classical due date and it is a time interval in which …

Structural properties and algorithms for earliness and tardiness scheduling against common due dates and windows: A review

GA Rolim, MS Nagano - Computers & Industrial Engineering, 2020 - Elsevier
This paper deals with earliness and tardiness scheduling around common due dates and
windows. Related problems share a strong practical importance due to the endogenous and …

A survey of the state-of-the-art of common due date assignment and scheduling research

V Gordon, JM Proth, C Chu - European Journal of Operational Research, 2002 - Elsevier
We aim at providing a unified framework of the common due date assignment and
scheduling problems in the deterministic case by surveying the literature concerning the …

Parallel machine scheduling problems: A survey

E Mokotoff - Asia-Pacific Journal of Operational Research, 2001 - search.proquest.com
In this paper, an overview of the research devoted to these problems with emphasis on the
case of the optimal makespan on identical parallel machines is presented. Scheduling …

Unrelated parallel machine scheduling with setup times using simulated annealing

DW Kim, KH Kim, W Jang, FF Chen - Robotics and Computer-Integrated …, 2002 - Elsevier
This paper presents a scheduling problem for unrelated parallel machines with sequence-
dependent setup times, using simulated annealing (SA). The problem accounts for allotting …

[图书][B] Learning curves

M Jaber - 2016 - api.taylorfrancis.com
Early investigations of the learning phenomenon focused on the behavior of individual
subjects who were learning-by-doing. These investigations revealed that the time required …

Unrelated parallel machine scheduling with setup consideration and a total weighted completion time objective

MX Weng, J Lu, H Ren - International journal of production economics, 2001 - Elsevier
This paper addresses the problem of scheduling a set of independent jobs on unrelated
parallel machines with job sequence dependent setup times so as to minimize a weighted …

Simulated annealing heuristic for flow shop scheduling problems with unrelated parallel machines

C Low - Computers & Operations Research, 2005 - Elsevier
This article addresses a multi-stage flow shop scheduling problem with unrelated parallel
machines. Some practical processing restrictions such as independent setup and …

Unrelated parallel machine scheduling with setup times and a total weighted tardiness objective

DW Kim, DG Na, FF Chen - Robotics and Computer-Integrated …, 2003 - Elsevier
This paper presents several search heuristics and their performance in batch scheduling of
parallel, unrelated machines. Identical or similar jobs are typically processed in batches in …

Weighted earliness/tardiness parallel machine scheduling problem with a common due date

OA Arık, M Schutten, E Topan - Expert systems with applications, 2022 - Elsevier
This paper investigates an unrelated parallel machine scheduling problem with a restrictive
common due date. The objective is to minimize the total sum of earliness/tardiness costs …