O Chinyere,
Y Sanusi, D Kulla - Nigerian Journal of Technology, 2023 - ajol.info
The RETScreen 4 software was used in this study to conduct the analysis to determine the
viability of the river Aku hydropower plant in Uturu, Abia State. The study was carried out …