Particle Swarm Optimization: A survey of historical and recent developments with hybridization perspectives

S Sengupta, S Basak, RA Peters - Machine Learning and Knowledge …, 2018 - mdpi.com
Particle Swarm Optimization (PSO) is a metaheuristic global optimization paradigm that has
gained prominence in the last two decades due to its ease of application in unsupervised …

Extensions of the resource-constrained project scheduling problem

H Ding, C Zhuang, J Liu - Automation in Construction, 2023 - Elsevier
The resource-constrained project scheduling problem (RCPSP) aims to schedule a set of
activities subject to resource and precedence constraints to minimize the project makespan …

Major advances in particle swarm optimization: theory, analysis, and application

EH Houssein, AG Gad, K Hussain… - Swarm and Evolutionary …, 2021 - Elsevier
Over the ages, nature has constantly been a rich source of inspiration for science, with much
still to discover about and learn from. Swarm Intelligence (SI), a major branch of artificial …

Solving large-scale discrete time–cost trade-off problem using hybrid multi-verse optimizer model

PVH Son, NT Nguyen Dang - Scientific Reports, 2023 - nature.com
The analysis of the relationship between time and cost is a crucial aspect of construction
project management. Various optimization techniques have been developed to solve time …

Time–cost–quality trade-off analysis for planning construction projects

T Wang, M Abdallah, C Clevenger… - Engineering …, 2021 - emerald.com
Purpose Achieving project objectives in constructionprojects such as time, cost and quality is
a challenging task. Minimizing project cost often results in additional project duration and …

Multi-objective time–cost trade-off optimization for the construction scheduling with Rao algorithms

M Yılmaz, T Dede - Structures, 2023 - Elsevier
Determining the time and cost of activities is one of the most important stages of construction
project planning. Measures taken to shorten the time, such as the need for more or more …

Time-cost trade-off model in GERT-type network with characteristic function for project management

L Tao, X Su, SA Javed - Computers & Industrial Engineering, 2022 - Elsevier
Activity crashing is an efficient way for project acceleration but always leads to time–cost
trade-off issues. The current study proposes an optimal time–cost trade-off model in GERT …

Optimizing time and cost simultaneously in projects with multi-verse optimizer

PVH Son, NT Nguyen Dang - Asian Journal of Civil Engineering, 2023 - Springer
Balancing time and cost has long been a primary focus of construction project management.
In this context, achieving optimal balancing time and cost objectives is crucial. The multi …

Discrete symbiotic organisms search method for solving large-scale time-cost trade-off problem in construction scheduling

D Liu, H Li, H Wang, C Qi, T Rose - Expert Systems with Applications, 2020 - Elsevier
Construction projects are becoming increasingly larger and more complex in terms of size
and cost. An optimization tool is necessary for the construction management system to …

A multi-agent based cooperative approach to decentralized multi-project scheduling and resource allocation

F Li, Z Xu, H Li - Computers & Industrial Engineering, 2021 - Elsevier
While project crashing is a prominent practice in project management and can be
approached by the well-known time–cost tradeoff problem (TCTP), the existing …