Integrated production and outbound distribution scheduling: review and extensions

ZL Chen - Operations research, 2010 - pubsonline.informs.org
In many applications involving make-to-order or time-sensitive (eg, perishable, seasonal)
products, finished orders are often delivered to customers immediately or shortly after the …

Integrated machine scheduling and vehicle routing with time windows

CA Ullrich - European Journal of Operational Research, 2013 - Elsevier
This paper integrates production and outbound distribution scheduling in order to minimize
total tardiness. The overall problem consists of two subproblems. The first addresses …

Coordinated scheduling of the outsourcing, in-house production and distribution operations

X Zhong, J Fan, J Ou - European Journal of Operational Research, 2022 - Elsevier
In this paper we study coordinated scheduling of the outsourcing, in-house production and
distribution operations. In our integrated scheduling model, each job is either outsourced by …

An ant colony optimization heuristic for an integrated production and distribution scheduling problem

YC Chang, VC Li, CJ Chiang - Engineering Optimization, 2014 - Taylor & Francis
Make-to-order or direct-order business models that require close interaction between
production and distribution activities have been adopted by many enterprises in order to be …

A coordinated algorithm for integrated production scheduling and vehicle routing problem

X Zou, L Liu, K Li, W Li - International Journal of Production …, 2018 - Taylor & Francis
In this paper, the integrated production scheduling and vehicle routing problem is
considered for a Make-to-Order manufacturer, who has a single machine for production and …

[HTML][HTML] A survey of single machine scheduling to minimize weighted number of tardy jobs

MO Adamu, AO Adewumi - Journal of Industrial and management …, 2013 - aimsciences.org
This paper presents a review of single machine scheduling to minimize the weighted
number of tardy jobs. The problem involves processing n jobs on a single machine, each …

Outsourcing and production scheduling for a two-stage flow shop

X Qi - International Journal of Production Economics, 2011 - Elsevier
In this paper we study the production scheduling problem for a two-stage flow shop in which
there are options of outsourcing some operations to subcontractors. The basic objective is to …

Integrated batch production and distribution scheduling with limited vehicle capacity

S Gao, L Qi, L Lei - International Journal of Production Economics, 2015 - Elsevier
We study a variation of the Integrated Production and Distribution Problem (IPDP) in which
orders are processed and delivered in batches with limited vehicle capacity. We emphasize …

Multi-objective analysis of an integrated supply chain scheduling problem

E Cakici, SJ Mason, ME Kurz - International Journal of Production …, 2012 - Taylor & Francis
We study the problem of minimising the total weighted tardiness and total distribution costs
in an integrated production and distribution environment. Orders are received by a …

Coordinated logistics scheduling for in-house production and outsourcing

X Qi - IEEE Transactions on Automation Science and …, 2008 - ieeexplore.ieee.org
In this paper, we address a new scheduling model for a firm with an option of outsourcing. A
job can be processed by either in-house production or outsourcing. All outsourced jobs have …