Extensions of the resource-constrained project scheduling problem

H Ding, C Zhuang, J Liu - Automation in Construction, 2023 - Elsevier
The resource-constrained project scheduling problem (RCPSP) aims to schedule a set of
activities subject to resource and precedence constraints to minimize the project makespan …

Efficient optimization of robust project scheduling for industry 4.0: A hybrid approach based on machine learning and meta-heuristic algorithms

A Goli - International Journal of Production Economics, 2024 - Elsevier
This research contributes significantly to the domain of Industry 4.0 by offering a nuanced
approach to the multi-objective optimization of the resource-constrained project scheduling …

Adaptive control of resource flow to optimize construction work and cash flow via online deep reinforcement learning

C Jiang, X Li, JR Lin, M Liu, Z Ma - Automation in Construction, 2023 - Elsevier
Due to complexity and dynamics of construction work, resource, and cash flows, poor
management of them usually leads to time and cost overruns, bankruptcy, even project …

[HTML][HTML] Metaheuristics for the bi-objective resource-constrained project scheduling problem with time-dependent resource costs: An experimental comparison

S Rodríguez-Ballesteros, J Alcaraz… - Computers & Operations …, 2024 - Elsevier
The bi-objective resource-constrained project scheduling problem with time-dependent
resource costs was recently introduced and consists of scheduling a set of activities subject …

Process scheduling for prefabricated construction based on multi-objective optimization algorithm

Y Li, J Wu, Y Hao, Y Gao, R Chai, S Chai… - Automation in …, 2024 - Elsevier
Prefabricated construction has become an increasingly important focus area in the
development of the construction industry. Determining an optimal construction process …

An improved memetic algorithm for multi-objective resource-constrained flexible job shop inverse scheduling problem: An application for machining workshop

S Wei, H Tang, X Li, D Lei, XV Wang - Journal of Manufacturing Systems, 2024 - Elsevier
Resource-constrained flexible job shop scheduling problems are commonly encountered in
some manufacturing industries, and have been widely studied in recent years. However …

A surrogate-assisted heuristic approach for the joint optimization of resource allocation and scheduling of an aircraft final assembly line

Z Bao, L Chen, K Qiu - Journal of Manufacturing Systems, 2023 - Elsevier
In an aircraft final assembly line, there exists flexibility in resource allocation in the sense
that processing time of a task can be reduced by allocating more workers to the task. As task …

Three-phase CPLEX with quota auction mechanism for dedicated resource-constrained multi-project scheduling problem with calendar constraints

F Kong, K Chen - Engineering, Construction and Architectural …, 2025 - emerald.com
Purpose In the realistic multi-project scheduling, resources are not always shared among
multiple projects, nor are they available to perform activities throughout the planning …

Solving the project scheduling problem with dependent resource constraints

CWR Lin, YS Lai, SY Jeng, HJ Hsiau - Journal of Industrial and …, 2025 - Taylor & Francis
Most resource-constrained project scheduling problems consider resources that are
independent of the job processing sequence. However, solving project scheduling problems …

Energy-efficient resource-constrained multi-project scheduling problem with generalized precedence relations and multi-skilled resources

E Goudarzi, H Esmaeeli, K Parsa… - The Journal of …, 2024 - Springer
This paper presents a new integrated model for the multi-skilled project scheduling and multi-
project scheduling problems, where the activities are technically linked through the …