Analysis of irregular three-dimensional packing problems in additive manufacturing: a new taxonomy and dataset

LJP Araújo, E Özcan, JAD Atkin… - International Journal of …, 2019 - Taylor & Francis
With most Additive Manufacturing (AM) technology variants, build processes take place
inside an internal enclosed build container, referred to as a 'build volume'. It has been …

Optimizing the sum of maximum earliness and tardiness of the job shop scheduling problem

M Yazdani, A Aleti, SM Khalili, F Jolai - Computers & Industrial Engineering, 2017 - Elsevier
The sum of the maximum earliness and tardiness criteria is a new objective function for the
job shop scheduling problem introduced in this work. A mixed integer linear programming …

A single-machine scheduling problem with multiple unavailability constraints: A mathematical model and an enhanced variable neighborhood search approach

M Yazdani, SM Khalili… - Journal of …, 2017 - academic.oup.com
This research focuses on a scheduling problem with multiple unavailability periods and
distinct due dates. The objective is to minimize the sum of maximum earliness and tardiness …

Minimizing sum of the due date assignment costs, maximum tardiness and distribution costs in a supply chain scheduling problem

P Assarzadegan, M Rasti-Barzoki - Applied Soft Computing, 2016 - Elsevier
In production systems, manufacturers face important decisions that affect system profit. In
this paper, three of these decisions are modelled simultaneously: due date assignment …

Multi-criteria sequencing problem for a mixed-model assembly line in a JIT production system

R Tavakkoli-Moghaddam, AR Rahimi-Vahed - Applied Mathematics and …, 2006 - Elsevier
Mixed-model assembly lines (MMAL) are a type of production lines where a variety of
products models similar to product characteristics are assembled in a just-in-time (JIT) …

Minimizing the weighted sum of maximum earliness and maximum tardiness costs on a single machine with periodic preventive maintenance

R Benmansour, H Allaoui, A Artiba, S Hanafi - Computers & Operations …, 2014 - Elsevier
We consider the problem of scheduling a set of jobs on a single machine against a common
and restrictive due date. In particular, we are interested in the problem of minimizing the …

Two-machine flow shop scheduling to minimize the sum of maximum earliness and tardiness

G Moslehi, M Mirzaee, M Vasei, M Modarres… - International Journal of …, 2009 - Elsevier
This paper presents optimal scheduling in a two-machine flow shop, in which the objective
function is to minimize the sum of maximum earliness and tardiness (n/2/P/ETmax). Since …

The use of a fuzzy multi-objective linear programming for solving a multi-objective single-machine scheduling problem

R Tavakkoli-Moghaddam, B Javadi, F Jolai… - Applied soft …, 2010 - Elsevier
This paper develops a fuzzy multi-objective linear programming (FMOLP) model for solving
a multi-objective single-machine scheduling problem. The proposed model attempts to …

[HTML][HTML] Single machine scheduling with unequal release times and idle insert for minimizing the sum of maximum earliness and tardiness

M Mahnam, G Moslehi, SMTF Ghomi - Mathematical and Computer …, 2013 - Elsevier
This paper addresses the problem of minimizing the sum of maximum earliness and
tardiness on a single machine with unequal release times and idle insert as realistic …

Particle swarm optimization based-algorithms to solve the two-machine cross-docking flow shop problem: just in time scheduling

I Hamdi, I Boujneh - Journal of Combinatorial Optimization, 2022 - Springer
Cross-docking is an innovative logistical strategy which provides less inventory holding
costs, less transportation costs and fast customer deliveries without storage in between or …